Creston Drive Open


The core drilling that was announced in an email blast on June 8th and which was expected to close Creston Drive at the site of the big slide today from 8:30 AM until 5:30 PM was completed at 1:15. The road is again open to residents, with the same limitations on size and weight as before.

Three holes were drilled, one at each end of the slide area and one in the middle, each about 6 feet back from the edge of the chasm. The two closest to Tanager Lane found rock at 25 feet. The one closest to Galax hit rock at 6 just feet. This information will assist the engineer in designing the appropriate repairs.



#Roads

Recent Posts