Catawba Trail Bridge Restored


The steel I-beam that was used as a footbridge across the Left Prong of the Catawba River on the Catawba Trail and which was recently dislodged by heavy rains has been restored to its prior location. A team of 9 heroic members of the Creston Trails Committee equipped with pry bars, ropes, straps and a come-along to move the extremely heavy (2000+ pounds) beam using only super-human manpower.

#Trails

Recent Posts