Over-paving Complete


The resurfacing of Kalmia, Trillium, Tanager, Galax, North Haven, Woodruff, Verbena, Warbler, Ninebark and Berry lanes was completed today and the gate has been restored to normal operation. The treatment looks very, very good. Kudos to Emery Paving for a job well done.

As stated in the broadcast message from IPM today, it takes several months for the surface to completely cure, so please do not turn the wheels of your vehicle while standing still or moving very slowly on the resurfaced roads; doing so will tear the pavement, leaving a area of no protection. There will be loose gravel for a while so please drive slowly.



Recent Posts